Commercial Lumley Building; 3 Levels of Foyer Upgrades & Elevator Shaft Work for fire protection whilst remaining operational.

  • Methodology, hoardings, site protection, dust barriers, signage
  • Demolish ceilings, construct new feature walls and bulkheads
  • Install new frame less glass access doors
  • Install new structural steel posts and PFC beams to lift
  • Install new Rondo and Decor tech ceilings to lift lobbies
  • Make good to wall/ceiling linings repaint
  • Make good floor to match existing
  • Re position lighting and install new illuminated signage to Council requirements